With concrete, everything we expect from it (strength, durability etc) is increased with proper curing – and so curing should be as long as it can be within reason. There is typically a minimum of 7 days for concrete driveways info to cure for, at as low as 5º C.

Share this story!

Leave a Reply

Your email address will not be published. Required fields are marked *